Customization: | Available |
---|---|
Function: | Identification, Payment, Encrypt/Decrypt, Information, Hotel Access Control |
Type: | Smart Card |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material
|
PVC / PET
|
Size
|
CR80 85.5*54mm as credit card or customized size or irregular shape
|
Thickness
|
0.84mm as credit card or customized thickness
|
Printing
|
Heidelberg offset printing / Pantone color printing /Screen printing: 100% match customer required color or sample
|
Surface
|
Glossy, matt, glitter, metallic, laswer, or with overlay for thermal printer or with special lacquer for Epson inkjet printer
|
Personazation or special craft
|
Magnetic stripe: Loco 300oe, Hico 2750oe, 2 or 3 tracks, black/gold/silver mag
|
Barcode: 13 barcode, 128 barcode, 39 barcode, QR barcode, etc.
|
|
Embossing numbers or letters in silver or gold color
|
|
Metallic printing in gold or silver background
|
|
Signature panel / Scratch-off panel
|
|
Laser engraving numbers
|
|
Gold/siver foil stamping
|
|
UV spot printing
|
|
Pouch round or oval hole
|
|
Security printing: Hologram, OVI securiting printing, Braille, Fluorescent anti-counter feiting, Micro text printing
|
|
Frequency
|
13.56Mhz
|
Applications
|
Bus pass,City card,Tourist transport card(Day Pass, 7-Day Pass, 13 Rides Pass, 30-Day Pass),Annual Pass etc.
|
Packing:
|
200pcs/box, 10boxes/carton for standard size card or customized boxes or cartons as required
|
Leadtime
|
Normally 7-9 days after approval for standard printed cards
|
Quantity
|
Carton Size
|
Weight(KG)
|
volume(cbm)
|
|
1000
|
27*23.5*13.5cm
|
6.5
|
0.009
|
|
2000
|
32.5*21*21.5cm
|
13
|
0.015
|
|
3000
|
51*21.5*19.8cm
|
19.5
|
0.02
|
|
5000
|
48*21.5*30cm
|
33
|
0.03
|
RFID Project-Based Card
|
||
QTY.(pcs)
|
with encoding
|
without encoding
|
≤10,000
|
7 days
|
7 days
|
20,000-50,000
|
8 days
|
7 days
|
60,000-80,000
|
8 days
|
8 days
|
90,000-120,000
|
9 days
|
8 days
|
130,000-200,000
|
11 days
|
8 days
|
210,000-300,000
|
12-15 days
|
9-10 days
|